JavaScript is required for basic dynamic and interactive browsing.

Ribbon cutting ceremony

Bakersfield held a grand opening celebration this morning of their new Engineering complex with a ribbon cutting ceremony. The new buildings were funded by two grants from the US Department of Education. The 5,000 square foot complex includes laboratory and classroom space that will house more than one million dollars of the necessary equipment to be used in the three Engineering Programs currently available at CSUB: Computer Engineering, which began in fall of 2011, and Electrical Engineering and Engineering Sciences, which began fall of 2012. Although the programs are fairly new, they have already surpassed the enrollment numbers that were not expected until 2015.